Installation instructions
1. Install
tires, disc brakes, motor wheels.
2. Install the
battery and replace the speed control handle.
3. Wiring the
controller, install the controller hanging bag.
Controller
Wiring
Method
1. Turn off the
power supply and the switch lock.
2. Connect the
Hall wire, motor phase wire, switch lock wire, throttle handle
wire,identification wire, and power wire in order to start debugging.
3.Turn
on the switch and the motor starts to rotate. If the wheel rotates in a
forward direction, the debugging is successful; if the wheel rotates in
a reverse direction, unplug the identification wire and connect it again
until it turns in the forward direction and the debugging is successful.
4. After the
debugging is successful, separate the two identification wire, turn the
knob to confirm the success, turn off the switch, and connect other
wires as needed. (When the motor is rotating forward, separate the
identification wire without turning off the power supply, the motor will
stop rotating, and the motor will be fully controlled by the handle at
this time. Turn off the power supply and the commissioning is
completed.)
Note
1. Electric
bicycles use direct current, the positive and negative poles of the
power supply must be connected correctly (red is the positive pole, and
black is the negative pole).
2. Make
sure the current is no smaller than 20A or the motor will not work.
3. Install
circle is the most easy to appear problem, if the disc brake and disc
brake device is not aligned, you can through the gasket to adjust.
4.The protection spring of
the power line at the motor should be placed in the outlet hole of the
motor shaft to protect the wire. The wire should be
placed in the groove of the motor.
|