|
|
Product Overview

|
110V Steam Aging Test
Machine Electroplating Element Life Acceleration Simulation Environment
Testing Machine |
| Steam aging testing machine is suitable
for accelerated aging life time test of electronic connectors,
ssemiconductor ICs, transistors, diodes, liquid crystal LCDs,
chip resistors and capacitors, and component metal pins before
tin-sticking test; Semiconductor, passive components, parts pin
oxidation test. Microcomputer temperature controller, LED
digital display, PID+SSR control, simple operation, accurate
data, stable performance! |
| Voltage: |
AC110V |
| Power: |
3000W |
| Timing
function: |
1-999 minutes/hour |
|
Steam tempuerature: |
Up to 97℃ |
| Controller: |
PID + SCR |
|
Material of inner and
outer boxes: |
SUS304 high quality
stainless steel |
|
Insulation layer: |
PV foam |
|
Heating time: |
About 45 minutes |
|
Control accuracy: |
±0.5℃ |
| Package size: |
33"*23"*27" (84cm*59cm*69cm) |
| Net weight/Gross weight: |
74LB(33.5kg) /
118LB(53.5kg) |
| Product Features & Advantages |
 |
1.Control Panel
Intelligent integrated design
of control panel, beautiful and easy to operate; Power
switch one key start, according to their own needs for
timing, temperature control, easy to operate flexible.
|
2.Test Drawer
The steam aging test machine
has three test rooms, and the test room is a drawer type
design, which can carry out a variety of tests at the same
time, saving time and effort.
|
 |
 |
3.High Quality Material
The machine is made of
preferred material, the internal and external box material
is SUS304 stainless steel, strong and not easy to deform,
not easy to rust, not easy to age, beautiful appearance.
|
4.Heat Dissipation
The design of heat
dissipation window on one side of the machine can dissipate
the heat generated by the motor in time, reduce the
temperature of the motor, and extend the service time.
|
 |
 |
5.Handle
Through the top handle can
easily lift the test area top cover, easy to operate.
Note: Do not carry through the top handle.
|
| - The inner and outer box are
made of SUS304 stainless steel. Beautiful appearance, not easy
to age. - With a
stainless water tank, can manually add water or external water
pipe, manual or automatic water supply at low water level, to
ensure that the experiment is not interrupted.
- The use of high-quality
temperature control system, PID control, SSR output, the
temperature is more accurate, high temperature quality is more
reliable.
- Timer can be diversified
Settings, (can be set seconds/minute - seconds/minute/hour -
minute/hour). Equipped with power outage memory function, it can
continue working according to the set time after power outage
and power restoration.
- The full detection system is
used, and the light is on when the fault occurs, which is
convenient for the operator to understand the equipment
condition in time.
- The heating pipe of the
heating system uses titanium tubes. Not easy to corrode, longer
service life.
- High stability platinum
probe, less error. |
|
Usage Steps
A. Before opening the power switch
on the machine, please follow these steps:
1. Confirm whether the water
inlet at the rear of the machine is connected to the water
source.
2. Turn on the POWER switch.
3. Set the experimental
temperature and time through the thermostat.
B.Direction for use :
1. After presetting the digital
switch and time period switch to the required position and
connecting the power supply, the digital display will start
timing from zero. When the preset time is reached, the delay
contact is converted, and the digital display keeps the current
number, realizing the timing control.
2. Reset function and use of
disconnection delay: At any time, the reset terminal will be
connected to the delayed contact point and will return to the
initial position. After disconnection, the digital display will
start counting from 0. Using this function, the external control
contact can be connected to the reset terminal to achieve
disconnection delay.
3. The interval between
disconnecting the power supply and reconnecting must be greater
than 1 second.
4. Do not control the line with
other strong wires in the same pipe or twisted wiring, so as not
to produce interference
5. If you need to turn on the
red switch of the panel for the second experiment after the
timer time arrives, start it again and set the temperature time
next time. |
|
Precautions
1. Before installation, test the
access voltage and check whether the power supply is matched.
Select the corresponding power supply voltage, do not be too
high, avoid burning the device, do not modify the power plug or
add the power cord, so as to cause overheating and fire. Do not
misconnect, and please fully ground the earth wire to maintain
the normal operation and life of the machine.
2. It is advisable to have a
separate water supply. After the installation of the water pipe,
check whether the joints are firm.
3. It should be powered by a
separate switch and cannot share power with other equipment.
4. The exhaust pipe should be
installed downward to avoid the internal box pressure imbalance
resulting in water overflow outside the box.
5. For thermocouple input
signals, please use compensating wires made of the same material
as the thermocouple wire.
6. Do not place this machine in
a place where there may be liquid splashing, the use environment
must be dry, cool and ventilated, please do not close to
valuable furniture or other household appliances, and away from
inflammable and explosive items.
7. The controller can be opened
for cleaning only when the temperature is below 40℃ to avoid
scalding.
8. Do not move the machine
during use; The instrument must be placed on a stable ground
before use, the inclination Angle is less than 5 degrees, and
the body is more than 10 cm away from the wall.
9. Do not touch the machine
during use and do not tilt it to avoid burns. |
| Product Presentation & Details |
| Steam Aging Test Machine *1 |
|
You can
make order with no worry.
Any concern just feel free to let us know, we'll reply in 24
hours in normal condition.
Handling Time: Shipping is usually made in 1-3 business days
after payments cleared. Orders are processed from Monday-Friday;
Not on the weekends & public holidays.
Warranty: 6 months' warranty for the machines, not for the
consumables.
We stand behind our products all the item, so even if your
warranty period has expired, you can still seek for service or
technical support from us with low cost. |
|