Usage considerations
●Pre-installation inspection:
Before installation of the ball valve,
carefully check whether the ball valve body, the ball, the stem and
other parts are intact or not so as to ensure that the product is
not damaged, and check whether the seal is loose and is damaged or
not so as to prevent leakage of air or liquid.
●Installation location selection: Choose
the location which facilitates easy operation and convenient
switching and maintenance, and consider the flow path in the valve
opening state so as to avoid any unnecessary pressure loss.
●Tightness
checking:
Check the stem position after the ball
valve is closed. If the stem position is fully contracted, it is
indicated that good sealing is achieved. If the stem position
protrudes, leakage may occur, and the problem needs to be solved
timely.
●Note
valve switches:
When the ball valve is operated,
starting or closing should be slow so as to avoid violent vibration
and ensure stability.
●Regular
inspection and maintenance:In order to
ensure the long-term stable operation of the ball valve, maintenance
should be carried out regularly, the impurities in the body should
be cleaned away, the sealing performance should be checked, and the
right amount of lubricating oil should be applied. |